Case Studies
|
Beta Steel Corporation
Port of Indiana, Portage, Indiana
Two-phase heavy industrial design/build project. Phase one consist of a 350,000 square foot manufacturing facility including construction of mill foundations, design/build of main and mill offices, and equipment installation. Phase two consist of a 150,000 square foot Electric Melt Shop including construction of supporting services and equipment installation.
|
| |
|
Deep River Water Park
Hobart, Indiana
Tonn and Blank helped to manage several challenges during this three phase construction project which was part of a large scale recreational facility. Tonn and Blank performed the duties as the General Contractor for Phase I, the Design/Build team for Phase II and the Construction Manager for Phase III. Our consistent involvement allowed for a smooth and seamless construction process throughout. The project included infrastructure for attractions such as wave pool, lazy river, water slides, cannon bowl slide and an ice rink for placement throughout the 25-acre site. The primary challenge during the three seasons was construction during the winter months and traffic flow during the summer months, all of which were tackled successfully by Tonn and Blank.
|
| |
|
Avery Dennison
Schereville, Indiana
This project was for a 15,500 square foot office and manufacturing facility. The primary challenge on the project was a very tight schedule. Following three short months of finalizing design details, the project construction began. Phase I included the challenge of pouring the concrete and setting the steel during the winter months. Once the structure was enclosed, the remaining construction was performed. This project was completed in only nine months from start of negotiations to completion.
|
| |
|
Franciscan Point Health Complex
Crown Point, Indiana
Tonn and Blank was involved from the onset of this state-of-the-art 85,000 square foot outpatient medical facility. The project was originally designed for 40,000 square feet. As the project parameters changed significantly, so did the technology originally planned. This created many changes throughout the project, yet the Tonn and Blank team completed the project according to the initial timeline.
|
| |
|
Lakeshore Bone & Joint Institute
Chesterton, Indiana
This two-story, 34,960 square foot comprehensive specialized orthopedic care center featured six physicians' suites, 18 examination rooms, and six cast rooms. The facility also includes four radiography suites and a therapy area that included exercise bicycles and workout machines. In addition to the state-of-the-art facilities, the building features environmentally responsible sustainable design concepts, including the use of recycled ceiling and floor tiles, regionally-obtained construction materials, a high energy-efficiency rating, a low volatile organic chemical (VOC) rating, and an infiltrated stormwater drainage system instead of a more "traditional" retention pond. Inside and out, Tonn and Blank managed this green design from conception through completion.
|
| |
|
Valparaiso Family YMCA
Valapariso Family YMCA
On May 4, 2009 the new 83,000 square foot Valparaiso Family YMCA opened its doors, marking an entirely new era of the YMCA's presence in the local community. Tonn and Blank Construction filled the role of both General Contractor and Construction Manager, working closely with the architect and YMCA leadership and committee members to bring the project to completion on time and under budget.
|
| |